STLC Phase
Input
Deliverables / Output
Requirement’s Review
  • BRS Document
  • SRS Document
  • Prototype Application
  • User Interface Documen
  • Contract Document
  • Proposal Document
  • Review document
  • Updated Review check list
Test Planning

  • Project QA Plan
  • SRS Document
Test Plan
Test Designing

  • SRS Document
  • Test Plan
  • Project QA Plan
  • Prototype Application
  • User Interface Document
  • Detailed Design Document
  • Test Design Document
  • Traceability Matrix Document
Test Execution

  • SRS document
  • Test Plan
  • Test Design Document
  • Traceability Matrix Document
  • Test Execution Summary Report
  • Defect Report

Test Closure

  • Test Execution Summary Report
  • Defect Report
  • Test Design Document
  • Traceability Matrix Document
  • Updated Defect Report
  • Traceability Matrix Document
  • Test Closure Certificate

Post a Comment

Emoticon
:) :)) ;(( :-) =)) ;( ;-( :d :-d @-) :p :o :>) (o) [-( :-? (p) :-s (m) 8-) :-t :-b b-( :-# =p~ $-) (b) (f) x-) (k) (h) (c) cheer
Click to see the code!
To insert emoticon you must added at least one space before the code.

 
Top
1 2 3 4 5 6 7 8 9